@extends('layouts.management') @section('content')
Assembly, manufacturing, and operational maintenance batch tracking.
{{ $order->production_number ?? 'PRD-'.$order->id }} - {{ $order->finishedItem->name ?? 'Unknown Finished Good' }}
{{ $order->businessUnit->name ?? 'Unknown BU' }} · Created {{ $order->created_at->format('M d, Y') }}
{{ number_format($order->actual_quantity, 2) }} / {{ number_format($order->target_quantity, 2) }}
{{ $material->name }}
Planned: {{ number_format($material->total_planned, 2) }}
Actual: {{ number_format($material->total_actual, 2) }}
Standardized component assemblies and raw material requirements.
Components: Pandrol clips (4x), Insulator pads (2x), Baseplates (1x), Heavy spring washers (4x).
Components: Mineral water bottles (500ml x 120), Boxed snack packs (120x), Disposable eco-cutlery sets (120x).
Components: Tapered roller bearings (4x), Axle seal rings (4x), High-grade lithium grease (15kg).
Operational depots and maintenance facilities executing work orders.
Heavy overhaul bay, diesel and electric rolling stock diagnostics.
Capacity: 12 Locomotives / Month • 85% UtilizationPermanent way equipment, ballast tampers, track geometry inspection.
Capacity: 450 Track Km • 72% UtilizationCold storage, rapid meal packaging, train loading platform.
Capacity: 2,500 Meals / Day • 90% Utilization